05-08-2009, 06:26pm
(This post was last modified: 05-08-2009, 06:30pm by Tony Nitrous.)
Done two.
Removed foot pegs and pillion seat. Nothing more.
Everything will drop straight back on in 15 minutes.
If you want a garantee'd answer give Bri a call,
he did my roadworthy, and will do single seat compliances.
http://www.motorcycleroadworthys.com.au/lk7mods.html
Removed foot pegs and pillion seat. Nothing more.
Everything will drop straight back on in 15 minutes.
If you want a garantee'd answer give Bri a call,
he did my roadworthy, and will do single seat compliances.
http://www.motorcycleroadworthys.com.au/lk7mods.html