28-10-2007, 05:29pm
Cheers guys.
Like everything it's takes a while to make thing fits the first time.
Still have to make up some brackets to fit the Fuel reg , fuel pump and boost control.
Get the oil feed and drain lines.
Relocate the radiator temp switch.
I might fit a second fan as well.
Hoping 2 to 4 weeks should be ready to start her up.
Like everything it's takes a while to make thing fits the first time.
Still have to make up some brackets to fit the Fuel reg , fuel pump and boost control.
Get the oil feed and drain lines.
Relocate the radiator temp switch.
I might fit a second fan as well.
Hoping 2 to 4 weeks should be ready to start her up.